Pikku Kivineva, Reisjärvi

Current information about Pikku Kivineva hybrid farm

The Pikku Kivineva wind-solar hybrid farm is located in Reisjärvi, southwest of Pitkäjärvi, about ten kilometers west of the town center. The preliminary plan area covers approximately 1000 hectares.

The project area is planned to include a wind farm with 8–15 turbines, with a total capacity of approximately 64–120 MW.

In addition to wind power, solar power production is also planned for the area. There are potential areas totaling about 100 hectares, with an estimated nominal capacity of approximately 120 MWp. The solar power production will utilize the wind farm's electricity transmission connections.

The project will be implemented through a joint procedure of the wind power master plan and the environmental impact assessment (EIA).

 

News

No news found

Map

VSB Gruppe - Pikku Kivineva - Finnland

Time schedule

2023-25 Commencement of wind farm planning, zoning initiative, landowner meetings
2025-2028 Local master plan and environmental impact assessment (EIA)
2029-2030 Building permits
2030-2031 Commencement of construction
2031-2032 Commercial commissioning of wind farm

Project information

Quantity of turbines 8-15
Total capacity 64-120 MW
Solar farm capacity 120 MWp
energy for you