In the Wielkopolska voivodeship, VSB Energie Odnawialne Polska sp. z o.o. has begun preparations for the construction of the Baranów-Rychtal wind farm. A total of 11 Nordex wind turbines with a combined output of 42.6 megawatts will be installed. The turbines are scheduled to go online in 2023.