Video: Foundation Works

 / 27.02.2024

A captivating peek behind the scenes of our project “Wind Farm Racibórz” in Poland: watch in awe as the foundation for a Nordex turbine, with a plinth as high as 7 meters and continuous anchor bolts 9.5 meters long - these are currently the highest foundations in Europe, and maybe even in the world, takes shape in less than 3 minutes.

Our project marks a significant stride towards a greener and cleaner world. Once the park is up and running, slated for the end of 2024, these 13 Nordex turbines will generate green power for approximately 36,000 households.
 
A heartfelt thank you to our dedicated partners P&Q, ONDE, CTE WIND (design), Hünnebeck (frameworks), Żwirkol / PTHU Matuszek (concrete), BRUCHPOL (reinforcement and concreting works), MARKUS Marek Walczak (grouting and isolation works), TECH-PROJECT (earth and road works) and EKO-WIATR BIS for their invaluable contributions to this project. Together, we're shaping a sustainable future.

energy for you