As a provider of comprehensive services in the field of renewable energy projects, we focus on two main directions: respect for the natural environment and dialogue with residents. Together with the administrative district of Oleśnica, we have created the Brzezinka hybrid park project, which consists of two sub-projects: Brzezinka PV (solar farm with a planned capacity of 303 MWp) and Brzezinka BESS (battery energy storage system with a planned capacity of 106 MW). 

At a glance

Environmentally friendly energy supply for approx. 180,000 households.

Annual energy production of approximately 446 GWh (PV + BESS).

Supply to the network of the operator Polskie Sieci Elektroenergetyczne S.A.

Located in the Lower Silesian Voivodeship – in the area of 3 communes: Oleśnica, Syców and Długołęka.

Comissioning in the second half of 2027.

Potential to become one of the largest hybrid parks in Poland and Europe.

News from construction

Infromation about the project

Solar park: Facts and timeline

We are a forward-thinking renewable energy project developer. Every single step of our solar park planning is based on solid experience. This gives you and us the assurance of rapid construction progress.

Commissioning second half of 2027
Location Lower Silesian Voivodeship, municipalities: Oleśnica, Syców, Długołęka
Occupied area 380 ha (effective ~260 ha)
No. of modules > 467,000
No. of central inverters 30 units (8.8 MW and 4.4 MW each)
Total capacity 303 MWp DC / 220.8 MW AC
Grid connection POI at 400 kV level
Timeline  
06/2021 Permitting
11/2025 Construction start
2027 Commissioning