Reference project Wittenberg

Back

Wittenberg
Sachsen-Anhalt, Germany

  • 1 units
  • Enercon E-70
  • 2.00 MW Total Capacity
  • Commissioning 2009
  • Project Development, Operation Management

Close to the city of Luther this Enercon E-70 is spinning. In 2009 it was connected to the local power supply system and since then it produces as much green energy as around 1,130 households consume per year. To get this amount of energy it would require nearly 3,000 tons of lignite.

To skip the following Google map
energy for you